The NeutralsORG

World Neutrals Summit 2026 — Barcelona · August 2026 · 69 spots remaining → Participate at Barcelona
TheNeutrals.ORG™
$200Clarity Snapshot™ from
11sections in every NER report
3–5days delivery
INDS™every evaluation governed
Submit NE-01 Intake →
System 02 · DRS
Dispute Resolution Systems

Seven instruments. One methodology. Arbitration is always the last resort — every instrument before it is designed to prevent it.

Explore DRS →
$800
Mediation from
56+
Convention countries
48h
Appointment
$800Mediation from
56+Singapore Convention countries
164NY Convention countries
48happointment confirmation
Appoint a Neutral →
The Neutral Profession
Get Certified. Join the Bench.

1,329+ certified neutrals. 80+ countries. 12 sector benches. Exclusive by design — maximum 10 per sector per country.

The Profession →
1,329+
Certified
80+
Countries
12
Benches
1,329+certified neutrals
80+countries represented
12sector benches
10max per sector per country
Apply — Free →
Home/Solutions/Construction & Infrastructure
Solutions / Construction & Infrastructure

Disputes cost construction
projects everything.

Construction disputes are among the most complex, costly, and relationship-destructive in any sector. TheNeutrals.ORG™ provides dispute boards, standing neutrals, independent expert determinations, and specialist arbitrators — all with genuine construction and engineering sector depth, all governed by our international standards.

DRB
Dispute boards for major projects
NEC/FIDIC
Standard-aligned procedures
48hr
Neutral appointment
Global
Engineers & QCs on bench
INDS™ — Our Methodology
Every evaluation we conduct follows INDS™ — the Integrated Neutral Dispute System.
Six stages. Seven principles. Four sub-frameworks. Not an opinion — a reproducible, scientific system. Developed and owned by TheNeutrals.ORG™.
Explore INDS™ →
Prevention is not a luxury in construction

A construction dispute that reaches arbitration can cost more than the original contract value.

By the time a construction dispute reaches formal proceedings, relationships are broken, projects are delayed, and reputations are damaged. The engineering profession has long known that prevention works better than resolution. The problem has never been the principle — it has been the infrastructure to deliver it.

TheNeutrals.ORG™ brings that infrastructure to construction through three complementary tools: Dispute Review Boards embedded from contract execution, Standing Neutrals available continuously throughout the project lifecycle, and — when disputes do crystallise — Independent Neutral Evaluation powered by INDS™ before either party enters formal proceedings.

The hierarchy is clear: prevention first, evaluation second, resolution third. Mediation and arbitration are last resort — available when everything else has been tried.

The construction dispute spectrum
Extension of time & delay claims — most common and contested; require neutrals who understand programming, entitlement, and quantum
Variation & change order disputes — scope creep and valuation friction requiring early neutral evaluation before claims harden
Defects & quality disputes — technical disputes requiring neutrals with engineering or surveying background
Sub-contractor & supply chain disputes — multi-party matters requiring neutrals who understand back-to-back structures
PPP & cross-border infrastructure — government counterparties, long contract terms, complex risk allocation
Why TheNeutrals.ORG™ for construction

Sector expertise. Not just process knowledge.

Our construction neutrals are not generalists who occasionally handle construction disputes. They are engineers, quantity surveyors, project managers, and construction lawyers — independently certified by TheNeutrals.ORG™ and bringing genuine technical depth to every appointment.

Engineers, QCs & QSs
Technical specialists on our certified bench — not lawyers pretending to understand construction
NEC & FIDIC aligned
Standard form contract expertise — neutrals who know your contract, not just dispute resolution procedure
DRB framework
Dispute boards designed and administered by TheNeutrals.ORG™ — globally recognised framework for projects of all scales
INDS™ powered
Every evaluation follows the Integrated Neutral Dispute System — structured, reproducible, and reliable
International enforcement
New York Convention enforcement for arbitration awards across all major infrastructure jurisdictions
Multi-party experience
Construction disputes are rarely bilateral. Our neutrals are experienced in multi-party proceedings
Prevention from day 1
Standing neutral and DRB programmes are deployed at contract execution — not after disputes emerge
GBI™ behavioural intelligence
Construction disputes are often behavioural before they are contractual. GBI™ identifies relationship fractures early
For construction & infrastructure

Prevent the dispute. Protect the project.

Appoint a construction specialist from the TheNeutrals.ORG™ bench, enquire about a Dispute Review Board, or commission an Independent Neutral Evaluation for a live matter.